We carry out all types of groundworks and civils from dig to drainage for packages ranging from £50,000 – £5,000,000.
Case study
Kidbrooke
The Kidbrooke Station Square is a residential-led mixed-use development in London SE3.
Find out moreCase study
DP World
Gobion Construction Ltd was awarded the Solent Container Yard Extension as Principle Contractor for the client DP World.
Find out moreCase study
Highways Agency
The Northern Highways Depot was a new facility development for The Highways Agency for Sandy, Bedfordshire.
Find out moreCase study
Morgan Sindall
The Hitchin Cricket Club development was the renewing of the existing club house, construction of new all weather facilities, construction of new development entrance and car park along with updating of the sites surrounding infrastructure.
Find out moreCase study
Vastint
The Strand East Works are part of the overall redevelopment of Hunts Island in Stratford by Vastint.
Find out moreCase study
Museum of St Albans
The Museum of St Albans (MOSTA) project was the redevelopment of the museum and the surrounding site into high end housing on behalf of St Albans Town Council.
Find out moreCase study
London Underground
As part of the Metropolitan Line bridge maintenance scheme Gobion Construction were appointed by Loftus Group to demolish bridge MR2, a disused bridge spanning the North and South line near Baker St Station, and construct a reinforced collision impact wall at street level.
Find out moreCase study
Crossrail
As part of the New Station works, Gobion Construction were appointed by Loftus Group to dismantle a number of wall structures to enable the construction of the new concourse and station entrance.
Find out more