London Underground.

Location MR2 Bridge, Grove Gardens, London

Sector Rail

Value £1.5M

The London Underground - MR2 Bridge Demolition and Replacement, London project involved the demolition of the disused MR2 bridge, spanning the North and South lines of the London Underground near Baker Street Station, and the construction of a reinforced collision impact wall at street level. This critical project required meticulous planning and execution to ensure the safety of construction personnel and train passengers while minimising disruption to train services.

Gobion Construction, as a subcontractor to Loftus Group, played a crucial role in the project by executing the entire scope of works, including bridge demolition, piling, retaining wall construction, and all associated civil engineering works.

  • Controlled demolition of the existing bridge structure, including the removal of the bridge deck and centre pier.

  • Installation of 14 piles at 10m depth, requiring the design and implementation of complex temporary works to ensure safety during construction.

  • Construction of a reinforced concrete retaining wall at street level, including the installation of trackside shutters and the placement of concrete within strict time constraints.

  • Design and installation of temporary works for access, demolition, and piling operations, including a crash deck for demolition works.

  • Construction of a brick façade on the street side, installation of new paving, and the placement of decorative bollards.

Project Challenges 

Working within a live rail environment, the project required meticulous planning and coordination to ensure the safety of both construction personnel and train passengers, while minimising disruption to train services.

Confined working space, the project involved working within tight constraints, particularly during piling operations, which required careful planning and execution to ensure the safety of personnel and the integrity of the existing infrastructure.

Maintaining strict deadlines, the project had a demanding schedule, requiring efficient planning and execution to meet the project deadlines and minimise disruption to train services.

Technical Expertise

Gobion Construction demonstrated its technical expertise in executing complex civil engineering works within a challenging environment, including:

Safe and controlled demolition of the existing bridge structure.

Innovative design and implementation of complex temporary works for piling operations.

Meticulous construction of the reinforced concrete retaining wall, ensuring high-quality workmanship and adherence to strict tolerances.

Effective coordination with London Underground to minimise disruption to train services.

Project Management, Gobion effectively managed all aspects of the project, including planning, scheduling, procurement, and site supervision, while ensuring compliance with all relevant safety regulations and approvals.

Safety and Compliance, Gobion prioritised safety throughout the project, adhering to all relevant safety regulations and implementing stringent safety protocols.

The Sloane Street underpinning project showcases Gobion Construction's expertise in executing challenging groundworks projects in densely populated urban areas. By demonstrating a commitment to safety, quality, and client satisfaction, Gobion successfully contributed to the preservation and revitalisation of this historic landmark.

⬇︎