Bengeworth road.
Location Bengeworth Road, London
Sector Civils
Value £3.5M
The Bengeworth Road Substation is a critical component of National Grid's £1 billion London Power Tunnels project, designed to rewire South London and enhance the region's electricity infrastructure. The project involves the construction of a new 400kV substation utilising SF6-free technology, ensuring a more sustainable and environmentally friendly solution.
Gobion Construction, as a subcontractor to Linxon, played a crucial role in the project by executing the groundworks package, which is essential for the successful construction of the substation.
-
Extensive earthworks, including excavation for the substation building, trenches for cables, and associated infrastructure.
-
Implementation of ground improvement techniques to ensure a stable foundation for the substation.
-
Installation of drainage systems to manage stormwater and prevent groundwater infiltration.
-
Coordination and execution of the diversion of existing utilities to accommodate the new substation.
-
Preparation of the site for subsequent construction phases, including levelling, compaction, and installation of temporary works.
Project Significance
The Bengeworth Road Substation is a vital component of the UK's energy transition, contributing to the secure and reliable supply of electricity to London.
The project utilises SF6-free technology, aligning with National Grid's commitment to sustainability and environmental responsibility.
The successful completion of the groundworks package is crucial for the timely and efficient delivery of the entire substation project.
Technical Expertise
Gobion Construction demonstrated its technical expertise in executing complex groundworks operations, including:
Precise excavation techniques to minimise the risk of damage to surrounding infrastructure and utilities.
Effective ground stabilisation measures to ensure the long-term stability of the substation.
Efficient coordination with other trades to maintain a smooth and efficient construction process.
Safety and Compliance - Gobion prioritised safety throughout the project, adhering to all relevant safety regulations and implementing stringent safety protocols.
Environmental Considerations - Gobion Construction demonstrated a commitment to environmental sustainability by minimising environmental impact during the groundworks phase.