Case study

Project Reality

  • Location Covent Garden, London
  • Sector Reinforced Concrete Works
  • Value £3m

Works Description

This is a mixed-use development for Guinness incl. distillery and bars.

The project involves

  • Demolition and alteration works to existing buildings – removal of exiting roofs to allow for additional floors to be introduced, removal of parapets, floors and internal staircases, forming new openings through load bearing walls.
  • Strip out of all existing mechanical and electrical services.
  • Drainage and associated waterproofing works incl. design.
  • Reinforced concrete slabs and upstands.